</>JoomCoder
Easy Time Manager — Documentation

Installation

Download

Download the latest Easy Time Manager package (pkg_easytimemanager_vX.X.X.zip) from your account on the Easy Time Manager product page.

Install

  1. Log in to your Joomla administrator panel.
  2. Go to System > Install > Extensions.
  3. Drag and drop the ZIP file onto the upload area, or click Browse for file and select it.
  4. Joomla installs the package and shows a success message.

On installation the bundled component automatically creates two user groups — Employee and Project Manager — and configures their default permissions.

Composer dependencies (Excel export)

Excel export uses the PhpSpreadsheet library. Install it once after deploying:

cd components/com_easytimemanager/lib
composer install

If Composer isn't available on the server, upload the vendor/ directory manually.

After installing

  1. Open Components > Easy Time Manager.
  2. Add your team to the Employee or Project Manager group in Users.
  3. Create a Joomla menu item pointing to Easy Time Manager so employees can reach the frontend.

See Quick Start for the first-run walkthrough.

Upgrading

The component uses method="upgrade" in its manifest, so you can install a new version directly over the old one without uninstalling first — your data and settings are preserved.

  1. Download the new version.
  2. Install it the same way as a fresh install (System > Install > Extensions).
  3. Your existing configuration and data remain intact.

Update key (paid updates)

Easy Time Manager is a commercial extension. To receive one-click updates, enter your download key in System > Update > Update Sites: click the Easy Time Manager Updates site and paste your key. Joomla then finds and downloads updates automatically.

Uninstalling

  1. Go to System > Manage > Extensions.
  2. Search for Easy Time Manager.
  3. Select the checkbox next to the package.
  4. Click Uninstall in the toolbar.

Warning: Uninstalling removes the component's database tables and all logged time, projects, clients, and leave data. Back up first if you might need the data later.